 1.
We don't simply pave over the problem. We remove the existing surface down 6 1/2" - 11 1/2".
Photo
 2.
Installation of geotextile fabric to stabilize aggregate base.
Photo
 3.
Then we install 3" - 8" of crushed aggregate base to create a firm but flexible foundation.
Photo
 4.
Next we add a 1" layer of sharp-angled bedding sand to lay the paving stones up on.
Photo
 5.
Individual paving stones are then placed by hand into the bedding sand, to ensure a perfect fit. Then a plate vibrator is passed over the stones, locking them into place.
Photo
 6.
A layer of sand is swept over the paving stones. We pass the plate vibrator over the surface a second time, forcing the sand into the joints from the top.
Photo
 7.
Finally, we place concrete foundations to protect the paving stones from shifting. This completes the permanent interlocking process.
Photo

link: Java Script / Applets Page

link: Java Script / Applets Page

link: Java Script / Applets Page

link: Java Script / Applets Page

link: Java Script / Applets Page



link: Java Script / Applets Page

link: Java Script / Applets Pagelink: Java Script / Applets Pagelink: Java Script / Applets Pagelink: Java Script / Applets Pagelink: Java Script / Applets Pagelink: Java Script / Applets Page
link: Java Script / Applets Pagelink: Java Script / Applets Pagelink: Java Script / Applets Pagelink: Java Script / Applets Pagelink: Java Script / Applets Page
Copyright 2008 Majestic Interlock. All Rights Reservered.
< link to process video coming soon!